Home » Products & Solutions » Product Loading Stations » Big-Bag Unloading Station

Big-Bag Unloading Station

Our modular Big-Bag Unloading Station BBU-1 is optimised use with Vacuum Conveyors for dust-free operation. It can be used for a variety of bulk materials, can be customised to aid with unloading of poor flowing products and bring them into process areas without any contamination of the product or surroundings. Customisation can be done easily to fulfil all local demands and application requirements.

BBU - Big-Bag emptying station with massaging paddles support to loosen up the product
BBU - Big-Bag emptying station
two big-bag emptying stations type BBU at a producer of food products
two BBU with glove boxes for connecting of the big-bag discharge outlet with a vacuum conveying system with low dust emission
additional product unloading option for bags, smaller sacks and bins
Previous slide
Next slide

Features and options:

  • for big-bags up to 1,400 kg
  • loading by fork lift or with an integrated crane and hoist
  • dust-free connection and emptying of big-bags
  • integrated filtration and dust recovery system to manage dust during change of big-bags
  • optional lump breakers and material agitators
  • combined systems with bag rip-and-tip station available
Callback-Service

Request a Callback

Tell us your phone number and the required time for the recall. Describe in brief your concern. We will contact you as soon as possible during our business hours.
Volkmann GmbH, Germany: +49 (0)2921 9604 0, business hours Mon. – Thurs.: 07:45 – 16:45, Fri.: 07:45 – 14:45
Volkmann UK Office: +44 (0) 1494 51 22 28

    Company *

    ZIP *

    City *

    Country *

    Gender *

    First Name *

    Last Name *

    E-mail *

    Tel. *

    Callback request *

    Subject *

    Message

    Data protection provisions *

    Travel to Volkmann GmbH in Soest impaired due to roadworks

    Visits to Volkmann GmbH in Soest will be considerably affected by roadworks over the next few weeks. The approach via the A44 motorway is particularly affected. A diversion will be set up, which will extend the journey by approx. 2 km or 5-10 minutes. The normal route from Volkmann to the motorway will remain open.

    The construction site and the diversion have been announced by the city of Soest for the period from 23 April to 17 July 2024.

    We show a map with the diversions route on page:
    https://volkmann.info/en/company/contacts_directions/