Volkmann vibrating feeder is suitable for a wide range of applications. It is ideal when automating a feeding process in combination with a vacuum conveyor and a complete with a buffer module and level probe.

Depending on the application you can use an open vibrating feeder or a closed hygienic dosing tube. Both variations are easy to clean.

Together with a vacuum conveyor and a material buffer it is possible to offer different types of weighing. For example, negative weighing or rather dosing with a vibrating feeder can achieve a batch accuracy of down to 1 g per cycle depending on the material.

It is possible to convert a discontinuous material transfer process into a continuous feeder with rates up to 1000 kg per hour.

Characteristics:

– Continuous material feed
– Accuracy down to 1 g
(depending on the material)
– More effective and gentle operation
– Easy to clean
– For use in Ex-Zones
– Low-wear
– Stainless steel AISI 304 or AISI 316
(product contacted parts)

Variations:

– Open/ closed U-profile dosing tray
– Closed pipe-profile dosing tube
– Clamp connections at the inlet and outlet
– Length and width of the dosing tube and
tray are variable

Options:

– Weighing module
– Dustfree design
– Integrate with sieving
– Quick change sieve insert

Do you find the application interesting and would you like to find out more about the topic or do you have a specific task?
Our application experts will be happy to help you Contact

Travel to Volkmann GmbH in Soest impaired due to roadworks

Visits to Volkmann GmbH in Soest will be considerably affected by roadworks over the next few weeks. The approach via the A44 motorway is particularly affected. A diversion will be set up, which will extend the journey by approx. 2 km or 5-10 minutes. The normal route from Volkmann to the motorway will remain open.

The construction site and the diversion have been announced by the city of Soest for the period from 23 April to 17 July 2024.

We show a map with the diversions route on page:
https://volkmann.info/en/company/contacts_directions/